Skip to content

Period-8 baseline: long-term stability report (Aug 2025 - Apr 2026)

Jinjing Li requested to merge period8-longterm-report into master

Follow-up to the original single-night period-8 baseline report: 78-run matched-filter monitoring across six calibration epochs (Aug 2025 - Apr 2026), FSMP cross-check on 27 runs, whole-detector drift census, and chip-vs-board analysis. Only the report PDF is added, next to the previous period8_baseline report.

Merge request reports